What Does “Make Good” Mean at Lease End?
Make good clauses tend to get very little attention at the start of a lease — the fit-out is exciting, the opening date is looming, and nobody’s thinking about what happens when the lease ends, possibly years away. That’s exactly why make good disputes are so common in commercial and retail leases across Australia: by the time they matter, the tenant has usually forgotten what they agreed to.
What Is a “Make Good” Obligation?
A make good clause requires the tenant to return the premises to the landlord at the end of the lease in a specified condition — commonly stripped back to base building condition, with the tenant’s fit-out, signage, and any alterations removed and the premises restored, patched, and repainted as required.
Why Do These Clauses Cause Disputes?
- Vague drafting. Clauses that simply require the premises to be returned in “good condition” or “as existed at commencement” leave enormous room for disagreement about exactly what’s required — down to whether floor coverings, ceiling grids, or air conditioning units installed by the tenant need to be removed.
- No agreed baseline. Without a condition report or photographic record from the start of the lease, it’s difficult for either party to prove what the premises looked like when the tenant moved in.
- Cost blowouts. Tenants are frequently surprised by how expensive a full make good can be — removing a substantial fit-out, patching services, and repainting a large retail space can run into tens of thousands of dollars, often more than the tenant budgeted for.
- Landlord “betterment.” Disputes arise where a landlord insists on a make good standard that leaves the premises in better condition than when the tenant took possession, rather than simply restoring the original condition.
What Should Tenants Check Before Signing a Lease?
- Get specific. Push for make good obligations to be defined by reference to a condition report and photographs taken at the start of the lease, not a vague description.
- Clarify what “base building” means for that particular premises, and whether any tenant-installed fixtures (mezzanines, cool rooms, specialised flooring) are expected to be removed or can be left in place.
- Consider a make good bond or cash contribution alternative, where the tenant pays an agreed sum instead of physically undertaking the works — this is increasingly common and avoids disputes over trade quality and timing.
- Check timing requirements. Some leases require make good works to be completed before the lease expires, which can be tight if the tenant is also trying to relocate and open a new site.
What Should Tenants Do Before Vacating?
- Review the lease well before the expiry date — ideally six months out — so there’s time to plan and budget for the works, or negotiate an alternative with the landlord.
- Document the premises’ condition again before starting any make good works, to protect against a landlord later disputing that the works were adequate.
- Get make good quotes early. Make good works are often underestimated, and a rushed job at the very end of a lease term rarely goes smoothly.
A make good clause that seems like boilerplate on day one can become one of the most expensive parts of exiting a lease. Reviewing it properly at the start — not the end — is by far the cheaper option.
If you’re negotiating a new lease or approaching the end of an existing one, get in touch with Gladwin Legal to review your make good obligations before they become a costly surprise.
This article is general information only and does not constitute legal advice.